expand Material : 01 AGGREGATE ‎(3)
expand Material : 02 ASPHALT ‎(3)
expand Material : 03 CONCRETE ‎(3)
expand Material : 04 PIPE ‎(3)
expand Material : 05 STEEL ‎(3)
  
expand Service Group : 00 ADMINISTRATIVE GROUP ‎(1)
expand Service Group : 01 INSPECTION SCHOOLS AND TECHNICAL TRAINERS ‎(3)
expand Service Group : 02 STOCKROOM ‎(3)
expand Service Group : 03 CENTRAL LABORATORY ‎(5)
expand Service Group : 04 REGIONAL LABORATORIES ‎(8)
expand Service Group : 05 DATA COLLECTION AND INVESTIGATIONS ‎(5)
expand Service Group : 06 MANUFACTURED PRODUCTS ‎(4)
expand Service Group : 07 FIELD OPERATIONS ‎(1)
expand Service Group : 08 PAVEMENT DESIGN AND ANALYSIS ‎(2)
expand Service Group : 09 PRODUCER/SUPPLIER FACILITY APPROVAL AND MATERIAL CERTIFICATIONS ‎(6)
expand Service Group : 10 ASPHALT PAVEMENT SPECIALISTS ‎(1)

 Materials and Tests Manual Search Results

 

 

04 REGIONAL LABORATORIES143485789/17/2024 6:38:27 PMstring;#<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/Materials/Pages/Materials-Manual-Text.aspx?Method=MM-04-04'>Burgaw https://connect.ncdot.gov/resources/Materials/Lists/MaterialsManual/AllItems.aspxFalse
04 REGIONAL LABORATORIES143485799/17/2024 6:38:46 PMContents KEY STAFF MEMBERS LOCATION​​ INFORMATION https://connect.ncdot.gov/resources/Materials/Lists/MaterialsManual/AllItems.aspxFalse
02 STOCKROOM143485939/18/2024 8:52:54 PMTypical Items Stocked Conventional Density Equipment Aggregate Testing Supplies Concrete Testing Supplies Concrete Cylinder Molds Chase https://connect.ncdot.gov/resources/Materials/Lists/MaterialsManual/AllItems.aspxFalse
08 PAVEMENT DESIGN AND ANALYSIS143485998/8/2019 3:37:15 PMPavement Design Manual​ Pavement Design for Driveways Memo string;#<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov https://connect.ncdot.gov/resources/Materials/Lists/MaterialsManual/AllItems.aspxFalse
09 PRODUCER/SUPPLIER FACILITY APPROVAL AND MATERIAL CERTIFICATIONS1434856612/21/2022 7:50:44 PMstring;#<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/Materials/Pages/Materials-Manual-Text.aspx?[GroupName]=09 PRODUCER https://connect.ncdot.gov/resources/Materials/Lists/MaterialsManual/AllItems.aspxFalse
01 INSPECTION SCHOOLS AND TECHNICAL TRAINERS1434857012/21/2022 7:50:09 PMstring;#<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/Materials/Pages/Materials-Manual-Text.aspx?[GroupName]=01 INSPECTION https://connect.ncdot.gov/resources/Materials/Lists/MaterialsManual/AllItems.aspxFalse
03 CENTRAL LABORATORY143485859/9/2024 8:40:23 PMContents KEY STAFF MEMBERS MATERIALS TESTED https://connect.ncdot.gov/resources/Materials/Lists/MaterialsManual/AllItems.aspxFalse
09 PRODUCER/SUPPLIER FACILITY APPROVAL AND MATERIAL CERTIFICATIONS143485976/10/2026 2:38:45 PMCertificates of Compliance ​ Corrugated Metal Pipe Certificate of Compliance ​ Fence Certificate of Compliance Example https://connect.ncdot.gov/resources/Materials/Lists/MaterialsManual/AllItems.aspxFalse
08 PAVEMENT DESIGN AND ANALYSIS143485989/18/2024 8:55:17 PMAlso conducts evaluation of existing pavements using FWD testing, coring, and dynamic cone penetration testing, and recommends possible rehabilitation strategies https://connect.ncdot.gov/resources/Materials/Lists/MaterialsManual/AllItems.aspxFalse
09 PRODUCER/SUPPLIER FACILITY APPROVAL AND MATERIAL CERTIFICATIONS143485677/9/2019 2:26:27 AMNC is the North Carolina Department of Transportation’s (NCDOT) portal through which NCDOT staff, business partners, and others can access and publish geospatial information https://connect.ncdot.gov/resources/Materials/Lists/MaterialsManual/AllItems.aspxFalse

 Related Documents

 

 

Appendices RFID Tag Parameters Concrete Pipe143481304/20/2026 3:12:43 PM4/20/2026 3:12:43 PMAPPENDICES RFID Tag Parameters for use on Concrete Pipe Material: .003" thick Polyester for subsurface printing Additional polyester layers total .2” Tag must be slotted on either STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx210https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{0AAE2503-EFF1-4B08-B0DB-347CDA734F28}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Concrete Pipe Producer Approval Policy143482377/29/2026 6:40:25 PM7/29/2026 6:40:25 PMROY COOPER JAMES H. TROGDON, III Dear Concrete Pipe Producer, A policy for Concrete Pipe Producers was established in 2011 This policy stated all Concrete Pipe Producers were STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx310https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{D6F0D459-C84C-4580-9069-CAA1F0BBF9D2}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Precast Concrete Annual Facility Audit Checklist143484405/4/2026 8:52:45 PM5/4/2026 8:52:45 PMDate: Click or tap to enter a date Is SCC Utilized in all production of NCDOT products Yes ☐No (if no explain) Comments The following are to be verified by marking Pass, Fail or N/A STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx210https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{808826AE-8186-48AD-8895-72FAD323DC01}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
SOP Concrete Pipe143485167/27/2026 2:49:35 PM7/27/2026 2:49:35 PMRev 6/28/2018 WCG NCDOT Materials and Tests Unit Standard Operating Procedure Inspection of Reinforced Concrete Pipe Effective July 1, 2018 Objectives The purpose of this SOP is STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx210https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{B11FCF47-9D95-4976-8DCF-1834D8546CC8}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Radiographic Testing Inspection Program143484917/27/2026 4:01:26 PM7/27/2026 4:01:26 PMThe RADIOGRAPHIC TESTING INSPECTION PROGRAM is reviewed during use for adequacy and updated as necessary by the NCDOT Materials and Tests Unit, Manufactured Products Group STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx110https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{AE0C870C-340A-4B61-AC93-6856B1E9AAC9}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
SOP Precast Concrete Units143485195/4/2026 8:56:57 PM5/4/2026 8:56:57 PM Standard Operating Procedures for Inspection of Precast Concrete Units Revised 4/17/2026 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER J. ERIC BOYETTE GOVERNOR STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx110https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{1E87C45C-A871-4825-9DC5-CB3B55AC2B1C}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
SOP_ready mix annual facility audit143485247/16/2026 8:24:59 PM7/16/2026 8:24:59 PMStandard Operating Procedure Ready Mix Annual Facility Audit Objectives:  The purpose of the Annual Facility Audit is to ensure that Ready Mix facilities are operating and STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx110https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{48A2BFA1-FA26-4F4C-926C-FD750A7472B7}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Materials Acceptance Guide_LAP_Jan 2025_PDF143893975/22/2026 6:07:13 PM5/22/2026 6:07:13 PM Local Administered Project Materials Acceptance Guide January 2025 Purpose The LAP Materials Acceptance Guide provides guidance and direction for material receiving, acceptance STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx110https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{3B389F06-2FEE-4AC8-BE1D-1ECCA4906C37}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
SOP Concrete Pipe 2026143979346/3/2026 1:26:10 PM6/3/2026 1:26:10 PMNCDOT Materials and Tests Unit Standard Operating Procedure Inspection of Reinforced Concrete Pipe Effective July 1, 2018 The purpose of this SOP is to establish guidelines for the STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx110https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{6E06BC21-02B6-4845-8983-3607AD82BE3F}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Acceptance Guidance for Concrete Reinforcement218547117/22/2026 8:31:19 PM7/22/2026 8:31:19 PMFROM: Materials and Tests Unit, Manufactured Products Group This memorandum is intended to describe the required documentation and provide guidance to receive non-coated and STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx110https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{A3482A93-0567-4AD7-9150-E33F5CA74607}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515

Was this page helpful?