• Bridge Management System Update

    NCDOT Research Project Number: 2001-18

Executive Summary

  • The objective of this project was to assist the NCDOT in updating parameters used in analysis of bridge inspection data for purposes of bridge management. Various parameters are used in OPBRIDGE, a bridge manage system decision support program for predicting optimum use of funds budgeted and for predicting performance of the bridges of the State of North Carolina in future years under various level of funding. In particular, the project examined and developed parameters for: Unit costs of replacements; Unit costs for rehabilitation; Maintenance effort as a function of element condition; Deterioration rate for major bridge elements; A DT growth rates for the bridge functional classifications and locations; Bridge-related accident unit costs; and Vehicle operating costs.  In most cases, improvements over the previous parameter values were possible as documented in this report. ​ 

  
Researchers
  
David W. Johnston
  
  

Related Documents

Report Period

  • January 2001 - December 2001

Status

  • Complete

Category

  • Structures, Construction and Geotechnical

Sub Category

  • Bridge Maintenance and Management

Related Links



Was this page helpful?