| 2016-11 | <a style='float:left;text-align:left;' href='ProjDetails.aspx?ProjectID=2016-11'>Planning Level Evaluation of the Effects of Ramp Metering on North Carolina Freeways</a> | Traffic, Mobility, Safety and Roadway Design | | Ernest Morrison |
| 2015-07 | <a style='float:left;text-align:left;' href='ProjDetails.aspx?ProjectID=2015-07'>Monetizing Reliability to Evaluate the Impact of Transportation Alternatives</a> | Traffic, Mobility, Safety and Roadway Design | Traffic Management | Ernest Morrison |
| 2015-09 | <a style='float:left;text-align:left;' href='ProjDetails.aspx?ProjectID=2015-09'>Planning-Level Extensions to NCDOT Freeway Analysis Tools</a> | Traffic, Mobility, Safety and Roadway Design | Congestion and Access Management | Ernest Morrison |
| 2014-13 | <a style='float:left;text-align:left;' href='ProjDetails.aspx?ProjectID=2014-13'>Exploring Corridor Operations in the Vicinity of a Diverging Diamond Interchange (DDI)</a> | Traffic, Mobility, Safety and Roadway Design | Traffic Safety | Ernest Morrison |
| 2014-14 | <a style='float:left;text-align:left;' href='ProjDetails.aspx?ProjectID=2014-14'>Performance Evaluation of 29-inch and 31-inch W-beam Guardrails on Six-lane, 46-foot Median Divided Freeways</a> | Traffic, Mobility, Safety and Roadway Design | Traffic Safety | Ernest Morrison |
| 2014-11 | <a style='float:left;text-align:left;' href='ProjDetails.aspx?ProjectID=2014-11'>Evaluation of Life Cycle Impacts of Intersection Control</a> | Traffic, Mobility, Safety and Roadway Design | Traffic Safety | Ernest Morrison |
| 2014-12 | <a style='float:left;text-align:left;' href='ProjDetails.aspx?ProjectID=2014-12'>Incident Management Assistance Patrols – Assessment of Benefits/Costs, Route Selection, and Prioritization</a> | Traffic, Mobility, Safety and Roadway Design | ITS and Incident Management | Ernest Morrison |
| 2014-16 | <a style='float:left;text-align:left;' href='ProjDetails.aspx?ProjectID=2014-16'>Rumble Strip Gaps for High Speed Bicycles on Downgrades</a> | Traffic, Mobility, Safety and Roadway Design | Traffic Safety | Ernest Morrison |
| 2014-15 | <a style='float:left;text-align:left;' href='ProjDetails.aspx?ProjectID=2014-15'>Synthesis of Contemporary Guidance and Recommendations for (A) Pedestrian Signal Provisions and (B) Marked Crosswalks at Uncontrolled Approaches</a> | Traffic, Mobility, Safety and Roadway Design | Traffic Safety | Ernest Morrison |
| 2014-32 | <a style='float:left;text-align:left;' href='ProjDetails.aspx?ProjectID=2014-32'>Assessment of Automated Sign Retroreflectivity Measurement</a> | Traffic, Mobility, Safety and Roadway Design | Equipment and Inventory Control | Ernest Morrison |
| 2013-07 | <a style='float:left;text-align:left;' href='ProjDetails.aspx?ProjectID=2013-07'>Design of Temporary Slopes and Excavations in NC Residual Soils</a> | Structures, Construction and Geotechnical | SubStructures, Foundations and Hydraulics | Ernest Morrison |
| 2013-10 | <a style='float:left;text-align:left;' href='ProjDetails.aspx?ProjectID=2013-10'>Performance Evaluation and Installation Guidelines for W-beam Guardrails behind Curbs</a> | Traffic, Mobility, Safety and Roadway Design | Traffic Safety | Ernest Morrison |
| 2013-09 | <a style='float:left;text-align:left;' href='ProjDetails.aspx?ProjectID=2013-09'>Delay and User Cost Estimation for Work Zones on Urban Arterials</a> | Traffic, Mobility, Safety and Roadway Design | Traffic Safety | Ernest Morrison |
| 2013-08 | <a style='float:left;text-align:left;' href='ProjDetails.aspx?ProjectID=2013-08'>Smartlink - Baseline for Measurement of Benefits</a> | Traffic, Mobility, Safety and Roadway Design | ITS and Incident Management | Ernest Morrison |
| 2013-11 | <a style='float:left;text-align:left;' href='ProjDetails.aspx?ProjectID=2013-11'>Safety evaluation of signal installation with and without left-turn lanes on two lane roads in rural and suburban areas</a> | Traffic, Mobility, Safety and Roadway Design | Traffic Safety | Ernest Morrison |
| 2012-05 | <a style='float:left;text-align:left;' href='ProjDetails.aspx?ProjectID=2012-05'>NCLOS Program 2010 Update</a> | Planning, Policy, Programming and Multi-modal | Traffic Surveys, Modeling and Forecasting | Ernest Morrison |
| 2012-06 | <a style='float:left;text-align:left;' href='ProjDetails.aspx?ProjectID=2012-06'>Development of Funding Project Risk Management Tools</a> | Planning, Policy, Programming and Multi-modal | Programming and Financing | Ernest Morrison |
| 2012-14 | <a style='float:left;text-align:left;' href='ProjDetails.aspx?ProjectID=2012-14'>NC Roadway Lighting Needs Assessment, Lighting Maintenance Prioritization Tool, and Performance Measures</a> | Traffic, Mobility, Safety and Roadway Design | | Ernest Morrison |
| 2012-13 | <a style='float:left;text-align:left;' href='ProjDetails.aspx?ProjectID=2012-13'>Pedestrian and Bicycle Accommodation on Superstreets</a> | Traffic, Mobility, Safety and Roadway Design | Traffic Safety | Ernest Morrison |
| 2012-11 | <a style='float:left;text-align:left;' href='ProjDetails.aspx?ProjectID=2012-11'>Performance Evaluation of 27-inch W-beam Guardrail under MASH TL-2 Conditions</a> | Traffic, Mobility, Safety and Roadway Design | Traffic Safety | Ernest Morrison |
| 2012-15 | <a style='float:left;text-align:left;' href='ProjDetails.aspx?ProjectID=2012-15'>Infrastructure Investment Protection with LIDAR</a> | Traffic, Mobility, Safety and Roadway Design | Miscellaneous | Ernest Morrison |
| 2012-12 | <a style='float:left;text-align:left;' href='ProjDetails.aspx?ProjectID=2012-12'>Development of Near Real Time Performance Measurements for Closed-Loop Signal Systems (CLS) Using Historical Traffic Data from Existing Loop Detectors and Signal Timing Data</a> | Traffic, Mobility, Safety and Roadway Design | Traffic Management | Ernest Morrison |
| 2012-36 | <a style='float:left;text-align:left;' href='ProjDetails.aspx?ProjectID=2012-36'>Work Zone Traffic Analysis & Impact Assessment</a> | Traffic, Mobility, Safety and Roadway Design | Traffic Management | Ernest Morrison |
| 2011-05 | <a style='float:left;text-align:left;' href='ProjDetails.aspx?ProjectID=2011-05'>Field Verification of Undercut Criteria and Alternatives for Subgrade Stabliization in the Piedmont Area</a> | Structures, Construction and Geotechnical | SubStructures, Foundations and Hydraulics | Ernest Morrison |
| 2011-10 | <a style='float:left;text-align:left;' href='ProjDetails.aspx?ProjectID=2011-10'>Comprehensive Safety Document/Product</a> | Traffic, Mobility, Safety and Roadway Design | Traffic Safety | Ernest Morrison |
| 2011-08 | <a style='float:left;text-align:left;' href='ProjDetails.aspx?ProjectID=2011-08'>Speed and Safety in North Carolina</a> | Traffic, Mobility, Safety and Roadway Design | Traffic Safety | Ernest Morrison |
| 2011-09 | <a style='float:left;text-align:left;' href='ProjDetails.aspx?ProjectID=2011-09'>Guidelines for Placement of Cable Median Barriers on 6:1 and 4:1 Sloped Medians with Horizontal Curvatures</a> | Traffic, Mobility, Safety and Roadway Design | Traffic Safety | Ernest Morrison |
| 2011-07 | <a style='float:left;text-align:left;' href='ProjDetails.aspx?ProjectID=2011-07'>Mobility and Reliability Performance Measurement</a> | Traffic, Mobility, Safety and Roadway Design | Traffic Safety | Ernest Morrison |
| 2010-13 | <a style='float:left;text-align:left;' href='ProjDetails.aspx?ProjectID=2010-13'>Modeling of On-Board and Drive-By Tire/Pavement Noise in North Carolina</a> | Environment and Hydraulics | Air Quality and Noise Abatement | Ernest Morrison |
| 2010-15 | <a style='float:left;text-align:left;' href='ProjDetails.aspx?ProjectID=2010-15'>Field Evaluation of Hydromulches for Water Quality and Vegetation Establishment</a> | Environment and Hydraulics | Erosion and Turbidity Control | Ernest Morrison |