​​
DISCIPLINE REQUIREMENTS


  
  
Description Of Work
  
  
  
  
AdditionalRequirements
Resources
  
Ground Penetrating Radar and Analysis096
Determination of layer thickness.
Project Technician/ EngineerP.E. or L.G.5P.E. or L.G.
Must submit five (5) examples of surveys with analysis and conclusions.
Matt Hilderbran, 919 329-4015, mrhilderbran@ncdot.gov
Pavement Analysis and Backcalculation149
Backcalculations of FWD. AASHTO ’93
Procedure and Pavement ME Design.
Pavement Design EngineerP.E.5P.E.
Must show project experience with AASHTO ’93 Procedure and Pavement ME Design. Must submit two (2) sample designs for concrete and asphalt for each procedure.
Matt Hilderbran, 919 329-4015, mrhilderbran@ncdot.gov
Pavement Deflection & Dynamic Cone Penetration (DCP) Testing151
Pavement and soil strength testing and pavement coring.
Project Technician with PE oversight2
Must have access/ownership to Falling Weight Deflectometer and must provide current calibration reports. Must have access/ownership to a Core Rig for DCP testing.
Matt Hilderbran, 919 329-4015, mrhilderbran@ncdot.gov
Pavement Design152
Design of concrete and asphalt pavement sections.
Pavement Design EngineerrP.E.5P.E.
Must show project experience with AASHTO ’93 Procedure and Pavement ME Design. Must submit two (2) sample designs for concrete and asphalt for each procedure.
Matt Hilderbran, 919 329-4015, mrhilderbran@ncdot.gov
Pavement Forensic Investigations438
Evaluation of contract documents, construction diaries, materials testing during construction, materials sampling and testing post construction, FWD test interpretation, and development of failure causes and recommended treatments.
Project EngineerP.E.5P.E.
Must submit two (2) reports of contract documents, construction diaries, and materials and test evaluations.
Matt Hilderbran, 919 329-4015, mrhilderbran@ncdot.gov
SID Inspection528
Perform and evaluate drilled shaft inspections for bridges
Engineering Technician- AdvancedNA2
Must have access/ownership to SID equipment. Must submit two (2) SID Inspection reports.
Matt Hilderbran, 919 329-4015, mrhilderbran@ncdot.gov
Pipe Inspection529
Perform and evaluate inspections on new/old drainage pipes.
EngineerP.E. and NASSCO Certified5P.E.
Must have access/ownership to a CCTV Rover and poll camera for inspection of multiple size and types of pipe. Must submit two (2) video inspection reports (to include all findings)
Matt Hilderbran, 919 329-4015, mrhilderbran@ncdot.gov
MIT Scans530
Perform and evaluation joints in concrete paving.
EngineerP.E.5P.E.
Must have access/ownership to a MIT Scanning device. Must be able to read and analyze the output onsite. Must submit two (2) MIT Scan Reports for review.
Matt Hilderbran, 919 329-4015, mrhilderbran@ncdot.gov
Friction Testing531
Collection of friction levels and skid resistance on pavements.
Pavement Design EngineerP.E.5P.E.
Must show access/ownership to either locked wheel and/or continuous friction tester that can be used at highway speeds. Must also provide current calibration reports/certification.
Matt Hilderbran, 919 329-4015, mrhilderbran@ncdot.gov
Was this page helpful?