Work Codes​



Only sele​​ct work codes your own forces can accomplish or that which you offer as a business service.
Do NOT select work codes that you subcontract​.
​  * = Copy of North Carolina License must be attached for this work code​​​​​​
​​​

Type of Work
  
Description of Work
Work Experience Last Five Years
Equipment List
Employee Requirements
Drilled Piers for Metal Poles
3030
This work code covers drilled piers for lighting, signals, and signs. Contractors requesting this work code should have experience with drilled pier construction including dry and wet placement of concrete and the use of temporary casing or slurry.
5 projects within last 3 years
Project Manager (5 years of continuous experience)
Superintendent (5 years of continuous experience)
Geophysical Services
3035
This work code covers Ground Penetrating Radar (GPR), Seismic Refraction/Reflection, Resisitivity, Electromagnetic (EM), etc. Contractors requesting this work code should submit an example for each type of work. A Licensed Geologist or Professional Engineer is required and has a minimum of five years experience.
5 projects within last 3 years. Also submit 2 example reports.
Geophysicist (5 years of continuous experience)
Project Licensed Geologist or
Professional Engineer (5 years of continuous experience)
Contaminated Materials Removal
3040
This work code covers the hauling of hazardous and non-hazardous materials. Contractors requesting this work code should have experience with handling, transporting and delivering contaminated soil and groundwater to a licensed facility.
5 projects within last 3 years
Superintendent (5 years of continuous experience)

HAZWOPER training from OSHA.
Drilling for Geoenvironmental Investigations
3045
This work code covers monitoring wells and soil and groundwater sampling. Contractors requesting this work code should have experience with air rotary, auger or direct push drilling on contaminated sites.
5 projects within last 3 years
Lead Driller (3 years of continuous experience)

Level "A" or "B" NC Certified Well Contractor from NCDEQ
Drilling for Geotechnical Investigations
3050
Contractors requesting this work code should have drilling equipment to access wooded and overgrown areas, obtain N and H size cores, perform standard penetration tests (SPT) with an automatic hammer, and drill 120 ft auger borings and 200 ft mud borings.
5 projects within last 3 years
Lead Driller (3 years of continuous experience)

Level "A" NC Certified Well Contractor from NCDEQ
Pile Driving Analyzer (PDA)
3060
Contractors should have experience with PDA-S, CAse Pile Wave Analysis Program (CAPWAP), version 2014, and GRL Wave Equation Analysis Program (GRLWEAP), version 2010, manufactured by Pile Dynamics, Inc. Submit for one steel pile example and one prestressed concrete pile example; both PDA testing examples with CAPWAP analysis and driving criteria.
5 projects within last 3 years. Also submit 2 example reports.
Licensed Professional Engineer with Advanced or Higher High Strain Dynamic Pile Testing (HSDPT) certification from Pile Dynamics. (www.pdaproficiencytest.com) (5 years of continuous experience)

Field Engineer with Intermediate or Higher HSDPT certification (1 year of continuous experience)
Crosshole Sonic Logging (CSL)
3065
Contractors requesting this work code should be able to provide examples of CSL testing for two different projects with drilled piers at least 42" in diameter and at least 4 CSL tubes per pier.
5 projects within last 3 years. Also submit 2 example reports.
Licensed Professional Engineer (5 years of continuous experience)
Field Engineer (1 year of continuous experience)
Non-Destructive Foundation Testing
3070
This work code covers gamma-gamma density logging, pile integrity testing (PIT), thermal integrity testing, ultra and parallel seismic testing, etc. except CSL (see work code 3065 above).
5 projects within last 3 years
Licensed Professional Engineer (5 years of continuous experience)
Foundation Testing
3080
This work code covers drilled shaft excavation inspection (Caliper Logging, Shaft Inspection Device (SID), Shaft Quantitative Inspection Device (SQUID) and Foundation Load Testing (Static, Rapid, Dynamic) except PDA (see Work Code 3060 above)
5 projects within last 3 years
Licensed Professional Engineer (5 years of continuous experience)
Micropiles
3100
Contractors requesting this work code should have successfully completed at least 250 micropiles within the last 3 years.
5 projects within last 3 years
Project Manager (5 years of continuous experience)
Superintendent (5 years of continuous experience)
Continuous Flight Auger (CFA) Piles
3110
Contractors requesting this work code should have successfully completed at least 250 CFA piles within the last 3 years and experience with automated monitoring and recording equipment.
5 projects within last 3 years
Project Manager (5 years of continuous experience)
Superintendent (5 years of continuous experience)
Vibration and Noise Monitoring
3120
This work code covers vibration and noise monitoring and pre/post-blast or pre/post-construction surveys.
5 projects within last 3 years
Project Manager (5 years of continuous experience)
Structure Movement Monitoring
3125
Contractors requesting this work code should have experience with monitoring ground or structure movement, displacement, deformation, settlement, subsidence, etc. And should have equipment to repeatedly measure centimeter movement.
5 projects within last 3 years
Equipment to repeatedly measure centimeter movement
Licensed Professional Land Surveyor (PLS) (3 years of continuous experience)
Ground Improvement Methods
3130
This work code covers dynamic compaction, stone columns, wick drains, etc.
5 projects within last 3 years
Project Manager (5 years of continuous experience)
Superintendent (5 years of continuous experience)
Subsurface Grouting
3135
This work code covers slab jacking, void filling, leak sealing, deep compaction grouting, deep injection, permeation grouting, etc.
Contractors requesting this work code should have experience with pumping cementitious grout or injecting polyurethane foam/gel for department of transportation or similar grouting work. For chemical grouting, equipment recommended by the polyurethane manufacturer or equipment capable of proportioning and mixing components in accordance with the polyurethane manufacturer’s requirements.
5 projects within last 3 years
Project Manager (5 years of continuous experience)
Superintendent (5 years of continuous experience)