Work Codes​



Only sele​​ct work codes your own forces can accomplish or that which you offer as a business service.
Do NOT select work codes that you subcontract​.
​  * = Copy of North Carolina License must be attached for this work code​​​​​​
​​​

Type of Work
  
Description of Work
Work Experience Last Five Years
Equipment List
Employee Requirements
* Roadway Lighting
1400
* Furnish, install, connect, and place into satisfactory operating condition lighting at locations identified on plans. Contractors performing this work code must posess and provide a copy of (certificate or number) a valid North Carolina electrical license.
Wood Pole Installation
1407
Contractors performing this work code are required to transport the wood pole to the site and place to a depth of at least 5.5' unless shown otherwise on the plans. This work code does not cover the installation of metal poles which are approved under code 1740 or wood pole installation for fences.
Water/Sewer Installation
1510
Furnish and install copper, plastic (PVC or PE), steel, or ductile iron pipes as specified on the plans. Contractors performing this work code are responsible for pressure and leakage testing, cleaning, and sterilization of the line.
36" (or Larger) Water/Sewer Installation
1520
Furnish and install, 36" diameter or larger, plastic (PVC or PE), steel, or ductile iron pipes as specified on the plans. Contractors performing this work code are responsible for pressure and leakage testing, cleaning, and sterilization of the line.
3 projects within last 5 years
Encasement Pipe (Bore and Jack)
1540
Furnish and install encasement pipe or casing pipe.Welded pipe shall be in accordance with ASTM A139. Contractor shall be responsible for installing carrier pipe through casing using spacers or insulators to support the carrier pipe. Ends shall be sealed with concrete or brick. Voids between the carrier pipe and casing pipes larger than 36" shall be filled with flowable fill or grout. The contractor shall be responsible for marking encasements for future use with a treated wooden marker post.
Trenchless Installation of Utilities
1550
Install primary carrier pipe or encasement pipe using trenchless methods. Contractor approved for this work code will be responsible for maintaining continuous support (shoring) to the soils surrounding both the pit and the trenchless excavation. Contractors will also be responsible for groundwater control and removal as necessary.
* Traffic Signals and ITS
1700
* Furnish, install, modify and remove signals, flashing beacons, intelligent transportation systems, and electrical systems. Materials, equipment, and hardware supplied must be pre-approved on the ITS and Signals Qualified Products List. Contractors performing this work code must have an IMSA certified, or equivalent, Level II traffic qualified signal technician standing by to provide supervision and emergency maintenance services whenever work is being performed on traffic signal controller cabinets.
Utility Installation/Removal: Fiber Optic Cable
1730
Furnish and install single-mode fiber optic communications and drop cable assemblies, fiber optic cable storage racks, identification makers, lashing wire, and hardware by aerial or underground installation.
Metal Pole Installation
1740
Furnish and install metal poles for overhead signs, traffic signals, etc. Tighten anchor bolt nuts connecting metal pole to concrete footing as specified. Work code does not cover installation of roadway lighting which are covered under work code 1400 or concrete footings (drilled piers) which are covered under work code 3030.
Directional Boring
2005
Furnish and perform installation of pipe using horizontal directional drilling below roadways or other objects to the lines and grade shown on the plans. Use mechanical and hydraulic deviation equipment to change the boring course and use instrumentation to monitor location and orientation of boring head assembly.
Utility Installation/Removal: Gas
2010
Furnish and install and/or remove underground natural gas lines as detailed in the plans. Contractor shall be responsible for all coordination with the utility company and turning off/on gas line prior to starting work and after completion.
* Utility Installation/Removal: Power/Electricity
2020
* Furnish and install and/or remove power lines as detailed in the plans. Contractor shall be responsible for all coordination with the utility company off/on power prior to starting work and after completion. Contractors performing this work code must posess and provide a copy of valid North Carolina electrical license.
Utility Installation/Removal: Telephone
2030
Furnish and install and/or remove underground or aerial telephone lines as detailed in the plans. Contractor shall be responsible for all coordination with the utility company prior to starting work and after completion.
Utility Installation/Removal: Cable Television
2040
Furnish and install and/or remove underground cable lines as detailed in the plans. Contractor shall be responsible for all coordination with the utility company prior to starting work and after completion.