Summary of Changes
Settlement Gauge RecordNew4/15/2014Form
  • ​Records settlement gauge data for calculating incremental and total settlement
Drilled Pier Inspection Forms (Casing & Slurry Methods)Revised2/18/2014Form
  • ​Updates Western Regional Geotechnical Manager name
Sound Barrier Wall Foundation Recommendations MemoRevised2/18/2014Form
  • ​Updates GEU Unit Head name
  • Removes "Estimated Maximum Height" from recommendations table
Temporary Shoring Recommendations and Standard Shoring Drawings MemosRevised2/18/2014Form
  • ​Updates GEU Unit Head name
Pile Driving Equipment Data Form, Rock Core and Shelby Tube TransmittalsRevised1/31/2014Form
  • ​Updates contact information
Anchored, MSE, Soil Nail and Soldier Pile Walls With Back Slope TypicalsRevised1/21/2014Cell
  • ​Adds concrete ditch for back slope
  • Renames cells for clarity
Concrete Ditch Behind Wall DetailsNew1/21/2014Cell
  • ​Addresses concrete ditch behind retaining wall with back slope and slope protection for concrete facing and coping
13Geotextile for Pavement StabilizationRevised1/21/2014Provision
  • ​​Revises tensile strength terminology based on Table 1056-1 in Materials provision
SP10 R001MaterialsRevised1/21/2014Provision
  • ​​Adds Type IL blended cement to Section 1000
  • Changes geotextile acceptance in Section 1056 to NCDOT Approved Products List (APL)
  • Updates temporary wall terminology for Section 1056
  • Replaces Table 1056-1
453.01Standard CIP Gravity Retaining WallRevised1/21/2014Drawing
  • ​Adds concrete ditch for back slope
SP05 R010Aggregate StabilizationNew11/19/2013Provision
  • ​Replaces Section 510
  • Adds Class IV subgrade stabilization to Section 510
5,6,11,12Anchored Retaining Walls (LRFD), CIP Gravity Retaining Walls, Soil Nail Retaining Walls (LFD-ASD), Soldier Pile Retaining Walls (LRFD)Revised11/19/2013Provision
  • ​Changes joint spacing in concrete facing and CIP gravity walls to 10-12 ft
  • Makes minor language improvements for clarity
Concrete Barrier Rail With Moment Slab DetailsRevised11/19/2013Cell
  • ​Changes concrete barrier height to 42"
MSE Abutment Wall Typical, MSE Wall Leveling Pad Step Details, MSE Walls With Guardrail TypicalsRevised11/19/2013Cell
  • ​Clarifies leveling pad step details for MSE walls with panels
  • Makes minor drafting improvements
  • Renames cells for clarity
8MSE Retaining Walls (LRFD)Revised11/19/2013Provision
  • ​Adds geosynthetic strips ("geostrips") for reinforcement type
  • Clarifies abutment wall definition
  • Adds bearing pad thickness requirements
  • Adds producer requirements for precast panels and SRW units
  • Updates website links
  • Makes minor language improvements for clarity
Precast and Segmental Gravity Walls With and Without Back Slope Typicals & NotesRevised11/19/2013Cell
  • ​Changes ditch terminology to "slope protection" for back slope
  • Makes guardrail and pavement section optional for no back slope
  • Removes paved ditch note for precast gravity wall for clarity
9,10Precast Gravity Retaining Walls (LRFD), Segmental Gravity Retaining Walls (LRFD)Revised11/19/2013Provision
  • ​Changes ditch terminology to "slope protection" for back slope
  • Adds producer requirements for PRW and SRW units
  • Updates website links
14,16Reinforced Soil Slopes, Standard ShoringRevised11/19/2013Provision
  • ​Adds geogrids with "approved for provisional use" (only for secondary reinforcement for RSS) with default total reduction factor
  • Updates website links
SP05 R020Soil-Cement Base (Full Depth Reclamation)New11/19/2013Provision
  • ​​Adds full depth reclamation (FDR) to Section 542
Standard Geotechnical Summary TablesRevised11/19/2013Form
  • ​​Adds tables for geotextile for pavement stabilization and aggregate subgrade/stabilization
Standard Precast Gravity Wall NotesRevised11/19/2013Notes
  • ​Removes paved ditch note for clarity
1803.01Standard Reinforced Soil SlopeRevised11/19/2013Drawing
  • ​Adds geogrids with "approved for provisional use" for secondary reinforcement with default total reduction factor
  • Updates website links
453.02,03Standard Segmental Gravity WallsRevised11/19/2013Drawing
  • ​Changes ditch terminology to "slope protection" for back slope
  • Updates website links
1801.01,02Standard Temporary Shoring and WallRevised11/19/2013Drawing
  • ​Adds geogrids with "approved for provisional use" for temporary walls with default total reduction factor
  • Updates website links
17Temporary Soil Nail WallsRevised11/19/2013Provision
  • ​Adds temporary guardrail
High Mount FoundationsRevised10/29/2013Provision
  • ​Updates edition number for AASHTO specification
Overhead and Dynamic Message Sign FoundationsRevised10/15/2013Provision
  • ​Updates edition number for AASHTO specification
High Mount FoundationsRevised9/17/2013Provision
  • ​​Updates software version for gINT and LPILE and edition number for AASHTO specification
13Geotextile for Pavement StabilizationRevised8/20/2013Provision
  • Clarifies when to notify Engineer to sample and test subgrade soils
  • Addresses asphalt mixture temperatures at time of placement for asphalt base courses
18Rock Slope MaterialsRevised8/20/2013Provision
  • Addresses PVC coated double-twisted hexagonal mesh wire