Sign In

  
  
  
  
  
  
Proc 2018-1.pdf
  
NCGS Baseline Calibrations (Revised)2/2/2018 11:58 AMR. Joel Gulledge
Proc 2018-2.pdf
  
Pole Data Sheet Report and Pole Data Collection for Base Mapping2/2/2018 11:58 AMR. Joel Gulledge
Proc 2018-3.pdf
  
Creating NCDOT Right-of-Way Plan Sheets for LET Projects9/28/2018 2:51 PMR. Joel Gulledge
Proc 2018-4.pdf
  
L&S Implementation of SharePoint Site Guidelines9/28/2018 2:51 PMR. Joel Gulledge
Proc 2018-5.pdf
  
Elimination of Need to Request Control Sheets and Property Ties and RW Series Development Timeline9/28/2018 2:51 PMR. Joel Gulledge
Proc 2018-6.pdf
  
L&S Required PEF Attestations for Individually Developed Survey Products9/28/2018 2:51 PMR. Joel Gulledge
Proc 2023-1.pdf
  
Right-of-Way Staking Notification9/11/2023 11:00 AMR. Joel Gulledge
Proc 2024-1.pdf
  
Slope Easements on Condemnation Maps5/6/2024 1:49 PMR. Joel Gulledge
Proc 2024-2.pdf
  
Changes in Condemnation Mapping12/9/2024 1:05 PMR. Joel Gulledge
Proc 2024-3.pdf
  
Parcel CADD File for Right-of-Way Acquisition12/9/2024 1:04 PMR. Joel Gulledge
proc1997-1.pdf
  
Memorandum Notebook7/11/2016 12:10 PMKim Buttry
proc1997-2.pdf
  
PEF Procedures - Interium and Permanent7/11/2016 12:10 PMKim Buttry
proc1997-3.pdf
  
Bridge and Railroad Surveys7/11/2016 12:10 PMKim Buttry
proc1997-4.pdf
  
Scoping and Negotiating Work7/11/2016 12:10 PMKim Buttry
proc1997-4a.pdf
  
Scoping and Negotiating Work - New7/11/2016 12:10 PMKim Buttry
proc1997-5.pdf
  
Right Of Way CADD Concerns7/11/2016 12:10 PMKim Buttry
proc1998-1.pdf
  
Property Contact Database and Procedures7/11/2016 12:10 PMKim Buttry
proc1998-2.pdf
  
Property Contact Database and Procedures Revised7/11/2016 12:10 PMKim Buttry
proc1998-3.pdf
  
Plan-Design Bridges7/11/2016 12:10 PMKim Buttry
proc1998-5.pdf
  
Conservation Easements7/11/2016 12:11 PMKim Buttry
proc1998-5rev7-01.PDF
  
Conservation Easements Revised7/11/2016 12:11 PMKim Buttry
proc1998-6.pdf
  
Right Of Way Appraisal Requests7/11/2016 12:11 PMKim Buttry
proc1998-7.pdf
  
NC MAP 4.07/11/2016 12:11 PMKim Buttry
proc1999-1.pdf
  
Procedures for GPS for PEFs7/11/2016 12:11 PMKim Buttry
Proc2000-1.PDF
  
Temporary Work Zone Signs7/11/2016 12:11 PMKim Buttry
proc2000-2.pdf
  
Reporting Destruction of Geodetic Monuments7/11/2016 12:11 PMKim Buttry
proc2000-3.pdf
  
Design File Generator7/11/2016 12:11 PMKim Buttry
proc2000-4.PDF
  
Work Zone Stay Alert Signs7/11/2016 12:11 PMKim Buttry
proc2000-5.PDF
  
Baseline Guidelines7/11/2016 12:11 PMKim Buttry
proc2000-6.pdf
  
Right of Way Field Verification7/11/2016 12:11 PMKim Buttry
proc2001-1.pdf
  
Temporary Work Zone Signs7/11/2016 12:11 PMKim Buttry
proc2003-1.pdf
  
Survey Control Data7/11/2016 12:11 PMKim Buttry
proc2003-2.pdf
  
Level D SUE Data7/11/2016 12:11 PMKim Buttry
proc2004-1.pdf
  
Jurisdictional Streams7/11/2016 12:11 PMKim Buttry
Proc2005-1.pdf
  
Labeling Advanced Aquisition7/11/2016 12:11 PMKim Buttry
Proc2005-2.pdf
  
L and S and Construction Responsibilities7/11/2016 12:11 PMKim Buttry
Proc2006-1.pdf
  
L and S and Construction Responsibilities7/11/2016 12:07 PMKim Buttry
Proc2008-1.pdf
  
Division Construction Engineer Letters7/11/2016 12:07 PMKim Buttry
Proc2008-2.pdf
  
Right of Way Plan Sheet Revisions7/11/2016 12:07 PMKim Buttry
proc2009-1.pdf
  
Final Survey Folder7/11/2016 12:07 PMKim Buttry
proc2009-2.pdf
  
HDS Pavement Scanning7/11/2016 12:07 PMKim Buttry
Proc2009-3.pdf
  
Baseline Information On Plan Sheets7/11/2016 12:07 PMKim Buttry
proc2010-1.pdf
  
Table of Right of Way and Easement Points7/11/2016 12:07 PMKim Buttry
Proc2012-1.pdf
  
Utilization of Location and Surveys Function Codes7/11/2016 12:07 PMKim Buttry
proc2014-1.pdf
  
New Location and Surveys SUE procedures7/11/2016 12:05 PMKim Buttry
proc2014-2.pdf
  
Plan Sheet Numbering System7/11/2016 12:05 PMKim Buttry
proc2014-3.pdf
  
Terrestrial Mobile LiDAR (Scanning) Guidelines7/11/2016 12:07 PMKim Buttry
proc2015-1.pdf
  
Timely Delivery Of PSD Maps7/11/2016 12:07 PMKim Buttry
proc2015-2.pdf
  
PEF Statement on Condemnation Maps (PSD)7/11/2016 12:07 PMKim Buttry
proc2015-3.pdf
  
NCGS Baseline Calibrations7/11/2016 12:07 PMKim Buttry
1 - 50Next