Turn on more accessible mode
Turn off more accessible mode
Connect NCDOT
Home
Help
Site Map
Connect NCDOT
Doing Business
Bidding & Letting
Projects
Resources
Currently selected
Local Governments
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Asset Management
Asset Management Overview
Asset Management Program at NCDOT
Principles/Strategies
Transportation Asset Management (TAM) Development
HMIP
HMIP Plans
Operations Program Management
Maintenance Condition Assessment Program (MCAP)
Performance Measures
Posted Roads
Secondary Roads and Subdivisions
Technical Training
State Maintenance Operations Manuals
Disaster Recovery
Interstate Maintenance Preservation Program (IMPP)
State Maintenance Operations
Training Videos
Resources
Maintenance Management System Hatch Maps
Assessment Resources
Contract Standards
2006 Specifications and Standard Drawings
2012 Roadway Standard Drawings
2012 Standard Specifications and Provisions
Roadway Standard Drawings 2002 (Archived)
AGC-DOT Joint Cooperative Committee & Roadway Subcommittee
2006 Specifications
Contracts Resources
Specifications Manuals
Division Operations and Maintenance Provisions
2012 Standard Specifications Search
Standard Specifications Library
2018 Roadway Standard Drawings
2018 Specifications and Special Provisions
Automated Proposal Application (APA) Home
2024 Specifications and Special Provisions
2024 Roadway Standard Drawings
Thank You
CS&D Process Resources
Environmental
Environmental Analysis
Environmental Policy
Geotechnical
Geotechnical Resources and Consultant Information
Revisions and Additions
Geotechnical Qualified Products
Cells, Details, and Forms
Notes and Provisions
Geopavement Resources and Consultant Information
Geotechnical Manuals
Geo3T2 2013 Presentations
Geo3T2 2015 Presentations
Geo3T2 2017 Presentations
Geoenvironmental Resources and Consultant Information
Geotechnical Combined Workshop Presentations
Geo3T2 2019 Presentations
CADD and Data Management
Quality Control and Quality Assurance Documents
GIS
Cartographic Standards
Find Division Engineer Letters
Links
GIS Standards and Practices
GIS Data Layers
DE Letters Street Name Search
Thank You
NCDOT Public Street Information Database (HB620)
Secondary Roads Assignments and Deletions
Division Engineer Letters
Hydraulics
Hurricane Florence
Highway Floodplain Program
Resources for Geopak Drainage (Archived)
U.S. Geological Survey Resources
Hydraulics Manuals
Highway Stormwater Program
Consultant Resources for Hydraulics
Resources for ORD Drainage
Drainage Studies Guidelines
Archived 2022 National Stormwater Practitioners Forum
Quality Control (QC) and Quality Assurance (QA)
Hydraulic Advertisements
NCDOT Pipe Material Selection Guide
Hydraulics Newsletters
Logistics and Freight
Materials & Tests
Concrete Certification Schools
ABC Sampling School
Aggregate Assessment Certification Program
Borrow Pit Sampling School
Field Welder Certification Program
QMS Asphalt Training Schools
QMS Density Gauge Class
Bridge Coatings Inspection Level 1 Schools
Conventional Density Schools
Field Welding Inspection Schools
Nuclear Density Testing – Base, Select, and FDR Materials
Nuclear Safety and Hazardous Schools
QMS Density Gauge Class Online Self Study
QC/QA Aggregate Sampling and Testing Class
Chemical Stabilization-Subgrade/Base QA
Chemical Laboratory
Asphalt Laboratory
Material Operations
Physical Testing Laboratory
Quality Assurance
GeoMaterials Laboratory
Structural
Density Gauge Assessment Certification Program
GeoMaterials Laboratory Training Schools
Materials and Test Manuals
Stockroom
Conventional Density Assessment Program
Materials and Tests Manual
Materials and Tests Manual Search
Drainage User Manual
Drainage User Manual
Drainage User Manual Search
Materials and Tests Search
Concrete Field Tech Study Guide
Concrete Field Tech Study Guide Search
Concrete Field Tech Study Guide
Materials and Tests Manual
Aggregate QC/QA User Manual
Aggregate QC/QA User Manual Search
Materials and Tests Manual
Aggregate QC / QA User Manual
Performance Graded Asphalt Binder QC/QA Program Manual
Performance Graded Asphalt Binder QC/QA Program Manual
Performance Graded Asphalt Binder QC/QA Program Manual Search
LGA Material Certification by CEI Firm
Technical Bulletins
Inspection Calendar
Blanket 10-8 for Training Classes
Thank You
Thank You
Concrete Equipment Procurement Request Form
Materials and Tests Unit Training Courses
NCDOT Request for Temporary Certification - Waiver to Practice Form
Chemical Stabilization-Subgrade/Base QA
Prestress Concrete Standard Repair Procedures
Pavement Preservation
Quality Systems
Mapping Resources
County & Bridge Maps
County Outline Map
NCDOT Division Maps
Traffic Volume Maps
Urban-Area Traffic Volume Maps
County-Area Traffic Volume Maps (By Year)
Traffic Survey Group
Road Inventory Data and Reports
Historical County Maps
Straight-Line Diagrams
Mapping Disclaimer
County & Bridge Maps Search
Posted Bridges Maps
Ordering Maps
Traffic Survey GIS Data Products & Documents
Traffic Count Database System (TCDS)
Traffic Viewer (TV)
NCDOT - CADD Innovation Team
OpenX Sample Planset
NCDOT CADD Guidance Documents
Training
Photogrammetry
Before & After Images
Aerial Imagery Assets
Image Gallery
Before & After Image Gallery
Noteworthy NCDOT Project Aerial Imagery
Professional Photogrammetry Related Links
What the Photogrammetry Unit Does
Aerial Surveying with Drones
How NCDOT Staff Request Mapping
Existing Geospatial Data
Notable Transportation Facilities Image Gallery
Disaster Response Image Gallery
SAV (Submerged Aquatic Vegetation) Image Gallery
NC Universities Image Gallery
Areas of Interest Image Gallery
Rail Division Resources
Policy & Specifications
Rail & Rail-Related Maps
Reports & Projects
Rail Passenger Corridor Identification & Development Program
Encroachment Agreements for NCDOT Rail Corridors
Freight Rail & Rail Crossing Safety Improvement Program
N.C. Train Host Trip Report Thank You
N.C. Train Host Trip Report
BIP2026-I40Planning
Currently selected
Roadside Environmental
Field Operations Links
Vegetation Management
Aesthetic Engineering
Landscape Design and Development
Environmental Operations
Field Operations
Field Operations Documents
Soil and Water
Outdoor Advertising
Annual Vegetation Maintenance (AVM) Permits
Structures
Structure Training Seminars & Papers
Spring Field Review
Spring Field Review Details
Culvert Standards
SMU Manuals
Project Special Provisions
Resource Documents
Standard Drawings
AGC and ACEC Minutes
Drawing Submittal Status and Design Notes
Structures Manuals
Policy Memos and Form Letters
Standard Design Plans
Construction Elevation Sketches
12 Month Letting - Bridge
Transportation Mobility and Safety
Crash Data and Maps
Highway Safety Programs and Projects
TEAAS Resources and Information
Ordinances
Traffic Engineering Accident Analysis System (TEAAS)
Transportation Systems Management and Operations
Route Changes
Traffic Engineering Policies
Congestion Management
Signing and Delineation
TSMO Unit - Qualified Products
Traffic Data
ITS and Signals Equipment Evaluation and Inclusion
ITS and Signals Equipment Submittal
ITS and Signals Introduction to QPL
Safety Evaluation Group
Traffic Safety Manuals
TSMO Unit Design Resources
Traffic Safety Data Files
Signing and Delineation Unit (SDU) Procedures Manual
I-40 - Clearing Oversize Vehicles for Effective Routing (I-40 COVER)
Planning project to address low bridges over I-40 in western North Carolina, forcing Oversize/Overweight (OSOW) permitted vehicles onto roadways that are not designed to accommodate them, creating costly diversions.
Skip Navigation Links
Connect NCDOT
>
Resources
>
BIP2026-I40Planning
Basic Project Information
Burke County Bridge Collapse Of 1998 - YouTube
Figure 3. Project Schedule from Obligation Grant Funds
I-40 Section May Reopen Monday- Crash Article
NBER_Highways_and_Globalization
Conclusion
NBER_Highways_and_Globalization
Criterion 1
TRIP_North_Carolina_Transportation_by_the_Numbers_Report_January_2021
110144_routine_08_10_2023 original
110146_routine_08_15_2023 original
110147_routine_08_14_2023 original
110154_routine_08_09_2023 original
110156_routine_08_09_2023 original
110169_routine_10_03_2023 original
110171_routine_10_04_2023 original
110173_routine_10_25_2023 original
170176_routine_04_04_2023 original
110025_routine_08_28_2023 original
110029_routine_08_16_2023 original
110037_routine_08_07_2023 original
110064_routine_08_09_2023 original
110095_routine_09_05_2023 original
110106_routine_08_09_2023 original
110112_routine_08_17_2023 original
110134_routine_10_25_2023 original
110129_routine_08_17_2023 original
110137_routine_08_29_2023 original
110143_routine_08_24_2023 original
110037_routine_08_07_2023 updated
110025_routine_08_28_2023 updated
110146_routine_08_15_2023 updated
110095_routine_09_05_2023 updated
110173_routine_10_25_2023 updated
110029_routine_08_16_2023 updated
110134_routine_10_25_2023 updated
110137_routine_08_29_2023 updated
110112_routine_08_17_2023 updated
110156_routine_08_09_2023 updated
110147_routine_08_14_2023 updated
110171_routine_10_04_2023 updated
Criterion 2
Figure8_I-40 Westbound Detours
230144_Damage_Figure5
230106_Damage_3_Figure5
230106_Damage_2_Figure5
230169_Damage_2_Figure5
230169_Damage_Figure5
230129_Damage_2_Figure5
230129_Damage_Figure5
Figure7_I-40 Eastbound Detours
Figure6_Oversize_Load_With_Secondary_Push_Trucks
230106_Damage_Figure5
I-40 Section May Reopen Monday- Crash Article
Criterion 3
NCDOT_Statewide_Freight_Plan
ATRI-Operational-Cost-of-Trucking-06-2023
NBER_Highways_and_Globalization
Criterion 4
Miles and Additional Travel Times for Diverted OSOW Permitted Vehicles
Criterion 5
County Distress Rankings (Tiers) _ NC Commerce
Figure 9. Mobile Home 1
Interstate Bridge Replacement Program_Cost Estimate & Funding
NCDOT- Small Businesses in NC have record year doing work for NCDOT
North Carolina Housing Finance Agency
Criterion 6
Harkers Island Bridge Replacement
NBER_Highways_and_Globalization
NCDOT- Small Businesses in NC have record year doing work for NCDOT
Application Information
I-40 COVER Project Narrative
Bridge Investment Program (BIP) Large Bridge Projects Application Template
I-40 COVER Budget Narrative
I-40 COVER Letter of Financial Commitment
Letters of Support
US Congress
No content found
NC Government
State Senator Hollo LoS
Organizations
No content found
Business
No content found
Was this page helpful?
Yes
No
© North Carolina Dept. of Transportation |
Privacy Statement
|
Accessibility