PM Guide
|
NCDOT PM Activity Diagram for Nov 2021
|
What is Project Management? (future link)
|
Section 1: General PM Topics
|
Chapters
| Tools
| Training
| Links
| Last Update
|
General PM Topics
|
Leading Teams
| Agenda And Meeting Minutes Template
| PM Guide Video
|
| 7/9/24
|
Quality Management
|
| | Quality Control/Quality Assurance (QA/QC) Guide
| 7/9/24
|
Quality Checklists Page
|
Risk Management
| | | Risk Assessment Resources
| 7/9/24
|
General Process Topics
|
Schedule Management
| MS Project PDN Schedule Template
| MS Project Quick Reference
| 6 Key Areas to Review
| 7/9/24
|
PDN Schedule Template (PDF) |
Scope Management Project Scope
| Project Data Sheet
|
| Project Initiation
| 8/8/24
|
Scope Management Scope of Services (SOS)
| Scope of Services Generator
| | General Engineering Services Consultant Scope
| |
Draft Scope of Services for V8i to OpenX Conversion
|
Contract Management
| | | Professional Engineering Firm Management Guide | 8/29/24 |
Project Funds Management
| | | IPD Preconstruction Finance Guide
| 8/1/24
|
Project Shelving
| | | Project Shelving Guidance (PDF)
| |
Project Shelving Guidance (DOC)
|
Documenting Status Prior to Temporarily Suspending a Project
|
Section 2: PDN Stage Specific
|
Chapters
| Tools
| Training
| Links
| Last Update
|
Project Initiation (PDN Stage 1)
|
Lead Team Through Project Initiation Handoff (Future link)
|
| |
| |
Environmental Documents and ROW Plans (PDN Stage 2)
|
Environmental Documents & DRPS
|
Leading Teams Through Environmental Decision Making
|
| Intial Project Coordination Training
| EPU Website
| |
Data Requests/Agency & Tribal Coordination
| | | ATLAS Site
| |
ETRACS Site
|
Integrated Mobility Division (IMD)
|
| | Policy Update Memo
| 8/28/19
|
Complete Streets Website
| |
Alternative Development
| | | | |
Impact Analysis
| | NEPA Training
| | |
Design Recommendation Planset (DRPS)
| | | | |
Environmental Document
|
|
| Distributing Environmental Documents
| |
Field Inspection &RPC |
Develop ROW, Utility and Permitting Strategy
| | | | |
Field Inspection
| | |
| |
Consultations
| | | NEPA/SEPA Consultation Guidance | |
Right of Way Plan Complete
|
| | | |
Final Plans (PDN Stage 3)
|
| | | | |
Plans, Specifications & Estimates (PS&E) (PDN Stage 4)
|
Leading Teams Through PS&E
| Questions for 15-Month Meeting
| Construction Contract Type Decision
|
| 9/10/24
|
PSE Checklist for Projects
|
Construction Contract Decision Matrix |
Post Design
|