expand Division : 00 SAFETY ‎(1)
expand Division : 01 GENERAL REQUIREMENTS ‎(7)
expand Division : 02 EARTHWORK ‎(15)
expand Division : 03 PIPE ‎(8)
expand Division : 04 MAJOR STRUCTURES  ‎(22)
expand Division : 05 SUBGRADES, BASES AND SHOULDERS ‎(12)
expand Division : 06 ASPHALT PAVEMENTS ‎(10)
expand Division : 07 CONCRETE PAVEMENTS ‎(5)
expand Division : 08 INCIDENTALS ‎(31)
expand Division : 09 SIGNING ‎(7)
expand Division : 10 MATERIALS ‎(39)
expand Division : 11 TRAFFIC CONTROL ‎(14)
expand Division : 12 PAVEMENT MARKINGS ‎(13)
expand Division : 14 LIGHTING ‎(9)
expand Division : 15 UTILITIES ‎(9)
expand Division : 16 EROSION CONTROL AND ROADSIDE DEVELOPMENT ‎(29)
expand Division : 17 SIGNALS AND INTELLIGENT TRANSPORTATION SYSTEMS ‎(31)
expand Division : ENGINEERING CONTROL ‎(1)
expand Division : SIGNIFICANT REVISIONS ‎(1)
  
expand R & R Section : RECORDS AND REPORTS ‎(48)

 Construction Manual

 

 

07 CONCRETE PAVEMENTS41576318/24/2022 11:09:22 AMContents 724-1 DESCRIPTION ADDITIONAL RESOURCES SECTION 724 - 2018 STANDARD SPECIFICATIONS 2018 STANDARD ROADWAY DRAWINGS 724-1 DESCRIPTION https://connect.ncdot.gov/projects/construction/Lists/ConstManual/AllItems.aspxFalseMaira IbarraCM-07-724
RECORDS AND REPORTS125295414/25/2022 3:01:46 PMContents GENERAL CORRESPONDENCE BY EMAIL TIPS FOR CORRESPONDENCE EXAMPLE CORRESPONDENCE https://connect.ncdot.gov/projects/construction/Lists/RecdRpts/AllItems.aspxFalseCORRESPONDENCEservice-spsnapmgr;Kim ButtryRR-03
RECORDS AND REPORTS125295425/31/2024 3:41:38 PMContents SAMPLE NARRATIVE SAMPLE PROGRESS SCHEDULE CHART The following is a list of instructions from the Contract https://connect.ncdot.gov/projects/construction/Lists/RecdRpts/AllItems.aspxFalsePROGRESS SCHEDULENathan Garcia;Leila BoulosRR-10
RECORDS AND REPORTS125295464/25/2022 3:01:47 PMFHWA 1273 require that prime contractors and subcontractors submit an Annual EEO Report ( FHWA 1391 ) each July for the duration of the project, indicating the number of minority https://connect.ncdot.gov/projects/construction/Lists/RecdRpts/AllItems.aspxFalseANNUAL EEO REPORT - FHWA FORM 1391Nathan Garcia;Kim ButtryRR-14
RECORDS AND REPORTS125295504/28/2022 6:25:12 PMContents SUPPLEMENTAL AGREEMENT PREPARATION AND NEGOTIATING SCOPE OF WORK MATERIALS LABOR https://connect.ncdot.gov/projects/construction/Lists/RecdRpts/AllItems.aspxFalseSUPPLEMENTAL AGREEMENTSNathan Garcia;Maira IbarraRR-18
RECORDS AND REPORTS125295524/25/2022 3:01:47 PMThe term “force account construction method” refers to construction work the Department performs on a federal aid project using its own forces This method of constructions is only https://connect.ncdot.gov/projects/construction/Lists/RecdRpts/AllItems.aspxFalseFORCE ACCOUNT CONSTRUCTION METHOD ON FEDERAL AID PROJECTNathan Garcia;Kim ButtryRR-20
RECORDS AND REPORTS125295537/21/2022 3:50:23 PMContents ACTIVE CLAIMS FINAL CLAIMS ACTIVE CLAIMS The following is the current https://connect.ncdot.gov/projects/construction/Lists/RecdRpts/AllItems.aspxFalseCONSTRUCTION PROCEDURE FOR CLAIMSNathan Garcia;Maira IbarraRR-21
RECORDS AND REPORTS125295564/25/2022 3:01:48 PMThese procedures are to be applied to those records that are used to form the basis of payment for contract pay items Project workbooks that pertain to the engineering control of a https://connect.ncdot.gov/projects/construction/Lists/RecdRpts/AllItems.aspxFalsePROCEDURES FOR RECORDING INFORMATION RELATING TO PAYMENTS FOR A CONTRACTNathan Garcia;Kim ButtryRR-23
RECORDS AND REPORTS125295584/25/2022 3:01:48 PMThe Highway Construction and Materials System (HiCAMS) allows entry of up to five digits to the right of the decimal This does not mean that those five digits must all be greater https://connect.ncdot.gov/projects/construction/Lists/RecdRpts/AllItems.aspxFalseSOURCE DOCUMENTS, MEASUREMENTS AND SIGNIFICANT FIGURESNathan Garcia;Kim ButtryRR-25
RECORDS AND REPORTS125295594/25/2022 3:01:48 PMContents GENERAL TICKETS ISSUED FOR PAYMENT BY WEIGHT GENERAL https://connect.ncdot.gov/projects/construction/Lists/RecdRpts/AllItems.aspxFalseWEIGHT TICKETS AS A BASIS OF PAYMENTSNathan Garcia;Kim ButtryRR-26

 Related Documents

 

 

Roadway Design Manual Rewrite Release 11-1-2021635893511/1/2021 3:00:57 PM11/1/2021 3:00:57 PM STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER J. ERIC BOYETTE GOVERNOR SECRETARY Mailing Address: NC DEPARTMENT OF TRANSPORTATION ROADWAY DESIGN UNIT 1582 STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/projects/Roadway/RoadwayDesignAdministrativeDocuments/Forms/AllItems.aspx710https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/projects/Roadway{A61E9C74-0638-46E6-A3CC-ABDAFF437D82}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Asphalt Plant Scale Verification125295929/21/2015 8:55:15 PM9/21/2015 8:55:15 PMPlant Scale Verification.xls STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/projects/construction/Construction Forms/Forms/AllItems.aspx110https://connect.ncdot.govzipFalseziphttps://connect.ncdot.gov/projects/construction{F8960A3A-4621-4520-8194-AF4CE66D0E8A}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_Default.js1717
Federal Hwy Admin 1022 Form1252959910/14/2010 3:25:58 PM10/14/2010 3:25:58 PMU.S. Department of Transportation Federal Highway Administration NOTICE The highway construction underway at this location is a Federal or Federal-aid project and is subject to STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/projects/construction/Construction Forms/Forms/AllItems.aspx110https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/projects/construction{C6A60BA8-EE0B-4113-BB7B-EE54B323B63D}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Form 253 Daily Report Portland Cement Concrete Pavement125296013/1/2007 7:04:43 PM3/1/2007 7:04:43 PMNORTH CAROLINA DEPARTMENT OF TRANSPORTATION DAILY REPORT ON PORTLAND CEMENT CONCRETE PAVEMENT ROADWAY INSPECTOR’S REPORT CONTRACT NO.: COUNTY: DATE: WEATHER: TEMPERATURE– HIGH STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/projects/construction/Construction Forms/Forms/AllItems.aspx110https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/projects/construction{6E8FA9A7-A331-491F-813E-4E5B343CD0B9}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Guideline for Unloading, Handling, and Stockpiling Reinforced Concrete Pipe (RCP)125296055/16/2019 6:38:46 PM5/16/2019 6:38:46 PMUnloading of pipe should be coordinated with the construction schedule and installation sequence to avoid re-handling and unnecessary equipment movement If a pipe is damaged during STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/projects/construction/Construction Forms/Forms/AllItems.aspx110https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/projects/construction{C78EB404-4CF8-4FC3-BE4C-B575AA69ED7A}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Construction Cost Estimate Form202992159/14/2023 4:23:13 PM9/14/2023 4:23:13 PMSTS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/projects/Roadway/RoadwayDesignAdministrativeDocuments/Forms/AllItems.aspx6460https://connect.ncdot.govaspxFalseaspxhttps://connect.ncdot.gov/projects/Roadway{9E269871-7ED1-49EB-B4A1-74604E75CCF5}SharePoint.Link~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_Default.js00
HiCAMs and DOH Vendor Release Notes V8.6.4 4310515/24/2021 6:39:03 PM5/24/2021 6:39:03 PMApplication Modifications and Enhancements HiCAMS & DOH Vendor Version 8.6.4 were released Friday, 05/21/2021. OVERVIEW OF THE RELEASE • Application enhancements in various STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/projects/construction/HiCams/Forms/AllItems.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/projects/construction{26FB2029-6712-4695-8CEE-0108939FBD72}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
HiCAMs and DOH Vendor Release Notes V8.6.34321331/22/2021 9:49:05 PM1/22/2021 9:49:05 PMApplication Modifications and Enhancements HiCAMS & DOH Vendor Version 8.6.3 were released Friday, 01/22/2021. OVERVIEW OF THE RELEASE • Application enhancements in various STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/projects/construction/HiCams/Forms/AllItems.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/projects/construction{BE12A00F-C9E0-4259-8901-D9B4C6453542}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
HiCAMS and DOH Vendor Release Notes V8.7.433330064/29/2024 4:08:47 PM4/29/2024 4:08:47 PMApplication Modifications and Enhancements HiCAMS & DOH Vendor Version 8.7.4 were released Friday, 04/26/2024. OVERVIEW OF THE RELEASE • HiCAMS Application enhancements - in STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/projects/construction/HiCams/Forms/AllItems.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/projects/construction{BF8EF8B7-5345-4271-A647-7F93F928F2F9}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
AWOS Installation or Replacement Process (4/2024)35352304/23/2024 2:09:29 PM4/23/2024 2:09:29 PMNorth Carolina Department of Transportation Division of Aviation | (919) 814-0550 | www.ncdot.gov/aviation April 2024 NCDOT Aviation’s Automated Weather Observation Systems (AWOS STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/municipalities/State-Airport-Aid/Documents/Forms/AllItems.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/municipalities/State-Airport-Aid{BCEF666A-3CD6-4B83-85E0-40CE160F4A3F}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515

Was this page helpful?