Final Estimate – Final Estimate Assembly. Any document that is required for inclusion in the final estimate.
Force Account Records – all records required for force account – This should include all spreadsheets, invoices, correspondence relative to force account.
Leftover Materials – any documentation that is relative to left over material payments.
Material Prepayments – any documentation relative to material prepayments.
Partial Estimate – partial estimates paid during the life of the project.
Pay Adjustments – any documentation relative to pay adjustments. This may include letters, density information, correspondence from M&T, etc.
Pay Records – Any documentation relative to pay records.
Photogrammetry – Any documentation relative to photogrammetry flight information.
Workbook Entries – Any documentation relative to workbooks.
Asphalt Daily Reports – Electronic M&T 605 form that inspectors can complete
Asphalt Documents –Electronic M&T 515QA Test Section and Random Location Generator
Asphalt Gauge – Control Strip –Allows electronic entry of core samples and gauge measurements for setting up control strip
Asphalt Gauge – Test Section–Allows electronic entry of nuclear gauge records.
Asphalt QC/QA – QC/QA density documentation
Proof Rolling Daily Report – Electronic Proof Rolling Report inspector can complete
Concrete Mix Designs – concrete mix designs approved for the project
Investigations – documentation from investigations due to material acceptance
M&T Test Results – Test Results from samples taken not related to asphalt
Prestressed Concrete – Information relative to prestressed concrete materials. Not associated with materials received
Structural Steel - Information relative to structural steel materials. Not associated with materials received
Sample Book – Electronic Sample Book Entries. Ability to record sample id number, date, sample type, used for, etc.
Soils Documents -